Client: NSB Teknikk AS

Year: 2011

SNC-Lavalin was involved throughout the process of building a new work shop and modifying an existing work shop for the new NSB trains provided by Stadler Rail.

SNC-Lavalin was also involved in the evaluation of Tenders on Maintenance related to Acquisition of Rolling Stock.

Concept Phase:

  • Localisation of work shops
  • Capacity Demand
  • Effective and Rational flow (LEAN)
  • Adaption to Norwegian Laws and Regulations
  • Recommendations to the NSB Management

Design Phase:

  • Specification of Train Elevators
  • Storage Logistics
  • Level 2 Maintenance Philosophy
  • Technical Investigations and Reports related to Fixed Production Equipment like Catenary, Traverses, etc.

Engineering Phase:

  • Evaluation of Train Elevators
  • Technical Approval of Lifts
  • Specification of Paternoster
  • Evaluation of Paternoster
  • Quality Control and Verification of Technical Solutions
The mandate of the project was to build an optimal work shop by LEAN principles, and implement an optimal operating concept.

Share this page

Contact Us


Karin Johansson
Regional Director, Norway
+47 905 66 062

Product Areas


Our unrivalled global capabilities can help your organisation succeed. Find out more about our product areas.

» Transport Advisory
» Rail Control Systems
» Infrastructure
» Rolling Stock