Client: Docklands Light Rail/Emirates Air Line

Year: 2012

The original commission was in October 2012 to undertake an audit of the Emirates Air Line cable car system focusing on:

  • Asset maintenance policy
  • Whole life cost model
  • Maintenance regime
  • Adequacy of the technical manuals and the requirement to ensure the safety of the Emirates Air Line

Following completion of the audit, we were commissioned to undertake an ongoing Engineering & Assurance Management role. Reporting to the Emirates Air Line and DLR Head of Engineering the scope included:

  • Chairing the Change Assurance Panel and undertaking Engineering Assurance Reviews
  • Interfacing with the Emirates Air Line operator
  • Managing Emirates Air Line projects such as:
    • Enhanced cabin steps for mobility scooters
    • LED lighting for cabin exteriors
    • The Aviation Experience, a tourist attraction including a flight simulator
    • New office and control room extension at the South Terminal

Share this page

Contact Us


Matt Phillips
Director, Rail Infrastructure Systems
+44 (0) 20 7105 3758

Product Areas


Our unrivalled global capabilities can help your organisation succeed. Find out more about our product areas.

» Transport Advisory
» Rail Control Systems
» Infrastructure
» Rolling Stock